Lab Pump Monitoring System






The following table provides a breakdown of the goals that will be reached by the deadline date mentioned on the right hand side. The dates are tentative and allow us to estimate our progress. The schedule motivates the group members to reach specific goals faster.



First Semester Date
Draft Website Due 3/3/14
Critical Subsystem Prototype Demo 3/24/14
Critical Design Review 4/14/14
Final Design Report Due 4/28/14
Order Parts 4/28/14
Second Semester
Assembly
Production Review
Interfacing with computer software
Final assemble and test
Troubleshooting system
Final project report
Prepare for design fair
Design fair