Montana State University

Wind Applications Center

MSU SKYSTREAM 3.7 Monthly Report

February 2010

Date Range 02/1-02/28

During the month of February the Skystream Turbine was fully operational.

The following is data from the Skystream from the Month of February 2010.

MSU Skystream 3.7 graph of February 2010 data

The total energy produced during this time period was 1.9 KWh

The average daily output was .1 KWh.