During the month of November the Skystream Turbine was fully operational.

The following is data from the Skystream for November 2010.
Montana State University | Wind Applications Center | MSU Skystream 3.7 Monthly Report | November 2010

The total energy produced during this time period was 45.5 KWh

The average daily output was 1.5 KWh.