Montana State University
Academics | Administration | Admissions | A-Z Index | Directories

Montana State Universityspacer Mountains and Minds
MSU AcademicsspacerMSU AdministrationspacerMSU AdmissionsspacerMSU A-Z IndexspacerMSU Directoriesspacer
 

CAPSTONE PROJECTS and GROUP ASSIGNMENTS

EMEC499  Mechanical Engineering Capstone 2
ETME499  Mechanical Engineering Technology Capstone 2


Department of Mechanical and Industrial Engineering

Spring 2014

Prof. Robb Larson - Associate Professor
Dr. David Miller - Assistant Professor


The modern engineering work environment requires  planning and teamwork to ensure project success. Our capstone projects reflect this reality with heavy emphasis on teamwork and interdisciplinary efforts. A productive team capitalizes on the diverse strengths of its members to achieve a superior project result. Whether single-discipline or multi-disciplinary in makeup, each group is expected to complete all project work in a timely manner with full participation of all team mates. Project results and course grades depend on it!

Project # Project Description
(Click links for text)
Student Team Members
ME/MET Continuing ECE
Continuing
Architecture
Continuing
ME/MET
New S14
Assigned Group Administrative Leader
(specified by number)
for the following date ranges:
Faculty Advisor
1 Lunabotics
1. Crawford, Andrew
2. Lynch, Benjamin
3. Nuno-Ramirez, Daniel
4. Reay, Shandon
5. Hammang, Ryan

6. Hoff, Jennifer

7. Miller, David
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
7. 4/13 - 5/3


Edens

(ECE backup is LaMeres)

 

2 Project 2 was combined with Project 3 last term
3 Formula SAE
1. Gardner, Ben
2. Willich, James
3. Ozgur, Tevfik
4. Dufficy, Tim
5. Bayger, Landon
6. Berres, Jacob
7. Cernick, John
8.Vaughn, Aaron
9. Zundel, Logan
 
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
7. 4/13 - 5/3

Larson
4 Baja SAE
1. Giorgis, Matt
2. Walker, Ben
3. Pearson, Noah
4. Rice, Tyler
5. Hoff, Shane
6. Jongeling, Shane
7. Krutzfeldt, Levi
8. Plant, Brandon
9. Smith 25, Adam J
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
7. 4/13 - 5/3

Larson
5 Project 5 was combined with Project 4 last term
6 SAE Aero
1. Jones, Shaun
2. Liebers, Josh
3. Jones, N
4. Tavary, Tesha
5. Waldorf, Brandon
6. Eddy, Shawn
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
1. 4/13 - 5/3

Miller
7 RoboSub- AUVSI
1. Danczyk, Matt
2. Platt, Wilson
3. Read, Alexander
4. Mantha, David
5. Hogue, Samuel
6. McGee, Jonathan
7. Whitt, Geoffrey
Administered through ECE Dept. Kaiser, ECE

(ME/MET
backup is Miller)
8 ASME design challenge
1. Goveia, Brian
2. Bonde, Michael
3. Barrett, Sean
4. Mohl, Jeff
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Miller
9 Human Powered Vehicle
1. French, Charles
2. Fabricius, Derek
3. Knutsen, Joseph
4. Possiel, Bryce
5. Schram, Tyler
6. Kirk, Jacob
7. MacKenzie, Alex
8. Schleuter, Markus
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
7. 4/13 - 5/3

Jenkins
10 ASHRAE- Integrated Sustainable Building Design
1, Peterson, Mary
2. Reaves, Martin
3. Lindenau, Theresa
4. Casper, Elyse
5. Moran, Terra
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
1. 3/30 - 4/12
2. 4/13 - 5/3

Amende
11 Project 11 was CANCELLED last term
12  ASHRAE Applied Engineering Challenge
1. Kennedy, Jordan
2. Yeoman, Kevin
3. McCullough, Colten
4. Thomson, Lewis
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Amende
13 ASHRAE Grant- pump efficiency
1. Malallah, Ahmad
2. Romagnoli, Ethan
1. 1/13 - 1/25

2. 1/26 - 2/8
1. 2/9 - 2/22
2. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
1. 4/13 - 5/3

Cundy
14 Habitat for Humanity 
1. Faeh, Joseph
2. VanBinsbergen, Jake
1. 1/13 - 1/25

2. 1/26 - 2/8
1. 2/9 - 2/22
2. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
1. 4/13 - 5/3

Cundy
15 YNP- Sustainable energy renovation
1. Bierwirth, Charles
2. Bunting, Will
3. Schmaing, Gerald
4. Eifrig, Mitchell
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Cook
16 Micro-hydro- Old Faithful
1. Bjornson, Blake
2. Serre, Joseph
3. Perry, Ethan
4. Johar, Chait
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Amendola
17 Projects 17-19 were CANCELLED last term.
18
19
20 Marine turbine Test Apparatus
1. Jobst, Trevor
2. Albares, Scott
3. Logan, Colin
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
1. 2/23 - 3/8
2. 3/9 - 3/29
3. 3/30 - 4/12
1. 4/13 - 5/3

Johnson
21 Composites Lab 2 - Test Specimen Design
1. Nunemaker, Jake
2. Gilreath, Trevor
1. 1/13 - 1/25

2. 1/26 - 2/8
1. 2/9 - 2/22
2. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
1. 4/13 - 5/3

Miller
22 Human powered treadmill
1. Murphy, Devin
2. Kuhlin, Sam
3. Giralt, Joseph
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
1. 2/23 - 3/8
2. 3/9 - 3/29
3. 3/30 - 4/12
1. 4/13 - 5/3

June
23 Tattoo Plier Veterinary Apparatus
1. Mower, Eric
2. Knudsen, Casey
3. Hurst, Daniel
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
1. 2/23 - 3/8
2. 3/9 - 3/29
3. 3/30 - 4/12
1. 4/13 - 5/3

Fisher
24 Oil Field  Proppant container
1. Wassmann, Trylan
2. Renaldo, Kyle
3. Braun, Isaac
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
1. 2/23 - 3/8
2. 3/9 - 3/29
3. 3/30 - 4/12
1. 4/13 - 5/3

George
 25 LED light illumination
1. Calvert, Brandon
2. Kormanik, Nicholas
3. Skuntz, Matthew
4. Hamilton, Ethan
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Sofie
26 Brewery Bottling Placer
1. Kulbeck, Kris
2. Soares, Jacob
3. Garrison, John
4. Bishop, Travis
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Davis
27 Cat Card Tool Bit Vending Machine
1. Wheatley, Kerry
2. Hesse, William
3. Salego, David
4. Balli, Batuhan

5. Jones, David

6. Vanek, Matthew

1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
5. 3/9 - 3/29
6. 3/30 - 4/12
1. 4/13 - 5/3

Jungst / Zignego

(ECE Backup is Maher)

28  Portable drift fence
1. Borisy, Austin
2. Al Eid Jassem
3. Alhumaidani, Metab
4. Hebein, Nicholas
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

Cosgriff
29 Quantel MVAT
(click for slideshow)
1. Thompson, Samuel
2. Raveling, Michael
3. Meuchel, Daniel
4. Derby, Weston J;

 

5. Smith, Seth B
Administered through ECE Dept. Repasky, ECE
30 Quantel Laser Power Measurement system
1. Keeley, Kevin
2. Colberg, Ryan
3. Losier, Justin
4. Danczyk, Jacob
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

George
31 Hard Drive Crusher
1. Scofield, Matthew
2. Johnson, Jeffrey
3. Murphy, Kevin
4. Alby, Avery
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
4. 2/23 - 3/8
1. 3/9 - 3/29
2. 3/30 - 4/12
3. 4/13 - 5/3

George
32 Solar powered thermoelectric cooler
1. Piyade, Hayri
2. Elofson, Hunter
3. Danforth, Cameron
1. 1/13 - 1/25

2. 1/26 - 2/8
3. 2/9 - 2/22
1. 2/23 - 3/8
2. 3/9 - 3/29
3. 3/30 - 4/12
1. 4/13 - 5/3

George
33 Solar Spectrograph Competition
1. Creveling, Jordan
2. Ferris, Blaine
3. Kartal, Ahmet
Administered through ECE Dept. Dickensheets, ECE

 



Montana State University 2005 Didn't Find it? Please use our contact list or our site index.